    We finally ordered a heat pump dryer to replace the old vented one and I completely forgot that it needs its own circuit, so now I’m staring at a panel where every slot is taken and there’s a double tapped breaker that I’m pretty sure shouldn’t be like that. The house is from the early 60s and I’ve been told the panel is original, which I take to mean it’s had a good run but is probably past it. I was going to visit site on a local electrician’s page to get a sense of whether this is a small job or a whole service upgrade, but I figured I’d ask here first since you all have actual houses with actual problems. Has anyone added a 240 volt circuit to an older Palo Alto home without replacing the panel, and did the city make you upgrade anything else once you pulled a permit? I’m trying to avoid the situation where one small appliance turns into a fifteen thousand dollar project.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.